CJI3 report

$
0
0

Hi,

 

I'm trying to find out the unsettled value in a WBS through CJI3. But I'm not able to segregate all these line items.

So please let me know, how to use layout/filter to find out this.

 

 

 

With Regards,

 

Soubhagya Rout


RE:SAP:Different assigned values in CJ31 and S_ALR_87013558 - Budget/Actual/Commit

$
0
0

Dear ps experts,

 

I am getting this error  one project in PROD

Project getting assigned values  in CJ31 Budget is 498,753,175 and assigned value is 127,907,382.29

And also Extra > availability control > analysis (assigned value = 127,907,382.29)

But in budget report S_ALR_87013558 assigned value is 194.962.298.

I run CJEN, CJBN, RKANBU01 but still problem is as it is.pl see screen shots

kindly help me very urgent basis

BR

prasad

 

Message was edited by: Mohamed Rafi - Do not use words like very urgent.

 

Message was edited by: Mohamed Rafi - Do not user words like very urgent.

 

Message was edited by: Mohamed Rafi - Do not user words like very urget.

CJ88 - Excluding of cost element from settlement run

$
0
0

May I know how to exclude a cost element from being processed by CJ88?

 

Reason for exclusion of costs posted to the cost element was because the costs posted were internal labour costing. Under my company's internal audit department's understanding such costs should not be settled to AuCs which are subsequently capitalized when the product is completed.

 

We have currently maintained the cost element under a cost element group MSLABOUR. This cost element group is maintained in allocation structure. For the assignment we maintained as such:

1.     FXA - Unchecked - Settlement Receiver 40200020

2.     CTR - Checked

3.     WBS - Checked

 

I have tried previously to remove the cost element group from the allocation structure however it has resulted in other costs posted to the WBS element unable to settle when error was encountered by the settlement run when system tries to settle costs posted to the cost element (internal labour costs).

 

PS experts, appreciate your advices please.

Beginner need advice for PS table

$
0
0

Dear All,

 

Kindly advice the function and name of  PS table that are normally use in PS module. Such as PRPS,PROJ,AUFC.

 

Many thanks in advance.

 

Nies

WBS-element field in Reservation

$
0
0

Hello to everyone, please could you please help me to resolve this issue.

 

We plan material for a project, through reservation to Network with material component (415 MvT). It is not known in advance if unrestricted stock exists, or it has to be procured from vendor. For this, MRP for project is intended to determine, and if required, created Planned Order after MRP run (Purchase Requisition consequently).

 

For unrestricted use stock to be considered in MRP, we set indiv./coll. field in MMR (MRP4 tab) to value 2.

 

After this, we cannot create reservation to WBS-element, bot only to Network (Error CN755 - An alternative account assignment/stock assignment is not possible). Otherwise, MRP run does not consider unrestricted use stock.

 

The problem with this reservation, it does not retrieve the value of WBS-element, and during the goods movement with reference to it (MIGO), it asks to fill a WBS-element, even though no field is open.

 

We tried to customize 415 MvT, define WBS-element field there, but no way to resolve this.

 

We could do one of two things:

 

1. Open WBS-element field in goods movement

2. Pass the value of WBS-element to reservation, considering Indic./Coll. field in MMR (MRP4) must be 2 (Coll.).

 

I surfed this forum many times, and have already read many discussions, but no use. If someone faced this issue before, and successfully resolved this, or could know ho to do this, please share your experience.

 

Thanks in advance.

Commitement Values in PS

$
0
0

Hi,

 

We are using both SAP and other system in our scenario. With SAP, we do project structure creation and budgeting. However project accounting related activities like PO, GRN are done in other external system.  As we are not using MM, POs are not replicated in SAP. However for budget control, we need to update commitment values in SAP. To update commitment values, we are planning to use funds commitment using FMZ1 tcode. by using this, commitments get updated and also the budget report looks ok. To update the actual costs in SAP against a project, we do financial posting against a WBS with a value equal to GRN value in other system. While posting this journal entry, is there any way we can refer the funds commitment value created for WBS earlier, so that commitment value reduces as of actual cost. One work around  I am looking is, while posting journal entry, I should first reduce the commitment value and then post the same amount.

 

Please let me know if you have solution to this.

 

Regards,

Laxminarasimha

CJI3 report

$
0
0

Hi,

 

I'm trying to find out the unsettled value in a WBS through CJI3. But I'm not able to segregate all these line items.

So please let me know, how to use layout/filter to find out this.

 

 

 

With Regards,

 

Soubhagya Rout

Primavera - SAP Interface/ integration

$
0
0

Hi,

 

I Need some information and help related to Primavera - SAP Interface/ integration.

 

1. what are the Prerequisites?

 

2. How it works - means how data will get transferred from primaver to SAP?

 

3. whether this transferr is Direct or some third party tool required. if yes then may know the options?

 

4. How much it cost approximate?  any option to transfer data without any third party tool?

 

5. any documents if you are having related to this please do send on same Id

 

Venkatesh


Error while deriving Project Structure

$
0
0

Dear ,

 

 

I have craeted a Project Y.006 with ACL functionality and all WBs elements at level 1 and saved project.

Now I am Opening the project and trying to derive the structure But I am gettting information message.

 

" You do not have create authorization in Y.006 object"

 

After clicking more help on that information message window it is showing Message no."CNACL_MSG_CL053"

I have also tried to locate the message number where it is used but not getting any result, getting result as no output.

 

But for the project where ACL functionaly is not active I am not getting any error. This error is coming only for the ACL fucntionaly active project.

 

Request you to revert with the reson and solution if anyone came across this type of issue.

 

Regards,

 

Pradeep Mahamuni

CJI3 report

$
0
0

Hi,

 

I'm trying to find out the unsettled value in a WBS through CJI3. But I'm not able to segregate all these line items.

So please let me know, how to use layout/filter to find out this.

 

 

 

With Regards,

 

Soubhagya Rout

Valuated Stock/Non-Valuated Stock or No Stock for Valuated Sale Stock Case

$
0
0

Dear All,

 

We are using Valuated Sales Order Stock for MTO/MTS Scenario with PP. Now, we want to use Project WBS for Monitoring and tracking cost of Projects using Project System and PS Cash Management Integration (WBS will be attached in Sales Order Line Item).

 

Let me know which Stock I need to use for this in Project Profile. i.e. Valuated Stock/Non-Valuated Stock or No Stock.

 

Please note that we are using Project WBS Only for better cost monitoring and for high level reporting.

 

Kindly Provide me your comment on same.

 

Regards

 

Atul Rajmane

Planned Dates Vs Actual Dates for Activities

$
0
0

Hi,

 

When i confirm an activity the planned dates are replaced with the actual dates. This way i am not able to view the planned vs actual dates scenario.

 

Can you please suggest a solution wherein the planned dates remain as they are even after confirmation.

 

Thanks and Regards

PS Network & activity Table related with PO

$
0
0

Hello experts ,

 

I need  a table name which will give me the details of

 

1) Network is a primary key and related to it the list of activity numbers .

 

2) now I also need to link these with PO number ???

 

Please help

 

Murali.s

PR restriction wrt to BOM quantity

$
0
0

Hi all,

 

I have one requirement from my client that If a BOM is assigned to the WBS and the PR is raised against that WBS manually through ME51n, then system should restrict if PR quantity for material exceeds the quantity mentioned in WBS BOM. Is there any standard configuration for this or shall I go with any enhancement.

Also is there any way to have the BOM automatically being displayed in the WBS component overview after doing CN33.

 

 

Thanks.

 

Asheesh

CJI3 report

$
0
0

Hi,

 

I'm trying to find out the unsettled value in a WBS through CJI3. But I'm not able to segregate all these line items.

So please let me know, how to use layout/filter to find out this.

 

 

 

With Regards,

 

Soubhagya Rout


PS Network & activity Table related with PO

$
0
0

Hello experts ,

 

I need  a table name which will give me the details of

 

1) Network is a primary key and related to it the list of activity numbers .

 

2) now I also need to link these with PO number ???

 

Please help

 

Murali.s

Project System Configuration

$
0
0

Hi All,

I am new to Project System.

 

1. Can any tell me what is Project, WBS Element, Network and Activity....

2. Please tell me step by step configuration of PS module.

3. Please tell me the flow of how it is working in SAP?

4. How it will integrated with other modules?

 

Thanks in Advance....

 

Regards,

Mohan.

Beginner need advice for PS table

$
0
0

Dear All,

 

Kindly advice the function and name of  PS table that are normally use in PS module. Such as PRPS,PROJ,AUFC.

 

Many thanks in advance.

 

Nies

Project System Configuration

$
0
0

Hi All,

I am new to Project System.

 

1. Can any tell me what is Project, WBS Element, Network and Activity....

2. Please tell me step by step configuration of PS module.

3. Please tell me the flow of how it is working in SAP?

4. How it will integrated with other modules?

 

Thanks in Advance....

 

Regards,

Mohan.

PS Tables

$
0
0

hello,

 

can any body provide info :Which table is the system, stores the  Project Def, WBS, Network and activity and User status related info.

 

Shiv