Hi'
I hope some of you can help us
Our solution:
* Material A is added at Contract i VA41
*A project with network and activities is created automatically (assembly processing)
*The project are changed to fit each delivery - end up with 2-30 WBS-elements
*CATS-confirmations at the network activities are created in CAT2 and transferred to the project through CAT5
*DP91 capture CATS-confirmations with activity type A = material A, B = material B and C = material C (material determination)
The DMR contain 1 line item per activity type
Now we would like the DMR to have these line items:
WBS 1 with activity type A
WBS 1 with activity type B
WBS 1 with activity type C
WBS 2 with activity type A
WBS 2 with activity type B
WBS 2 with activity type C
WBS 3 with activity type A
and so on.
How can we solve this issue?
The WBS-elements have different names for each project. We had not succes to create a Set reflecting this.
How can we make the setup resulting in the mentioned DMR line items.
I hope for some input.
Thank you in advance
Regards
Lone