Hi Experts,
I need to make RA Key Mandatory on the Level 2 WBS in the structure for only a particular project profile. what should be the right approach for this?
a) via PS validations
b) Define field selection configuration
I believe a) is possible, was not sure if such conditional requirement is possible via Field selection configuration too?
Thanks,
Krishna