Cut Over Stratergy

$
0
0

Dear All,

We are going to fix cut over stratergy for go-live, but i as per requirement, i need to capture all historical costs and revenues (which were inccured in legacy system) into SAP. So i have very much confusion in this regards,kindly help me on this.

 

     Here the challenge is that, we need to calculate the RA (Cost based POC method) values in SAP based on cummulative Costs and Revenues both

Planned and Actuals.

 

I have read some blogs but still i have no clarity on bringing the historical Costs and Revenues into SAP. If any one can explain in detail that will be helpfull for me. Also please guide me how the WIP will be brought into project.

 

 

 

 

So please guide me how to achieve this.

 

 

 

 

Regards,

Rao.