I have completed assembly processing configurations to create project from sales order, set up schedule line for item category, configured material and assigned material to standard network and standard WBS. Strategy group assigned to material, requirement class and requirement type created,
requirement type assigned to item category. Standard WBS element has account assignment and billing elements checked. The network gets created, but the project and WBS does not. I am getting screen WBS elements for settlement and account assignment.
The same setups work prior to a system refresh that was done about 2 weeks ago. See attached document.
Any idea what may be the issue?