Hi Fellows,
Currently I have the follow situation,
I create a Project with dates, resources and equipments, and after that I calculate the dates of the Project. hitherto I had the basic dates, next I transferred basic dates to forecast dates.
That situation was in 21/01/2015, but today (23/01/2015) I can´t to see the "Gap" between forecast dates and basic dates, How I can to see that difference in the dates
Thanks in advance